"This gave the whole project continuity & also gave us the ability
to be flexible with our budget..." -
Regus Business Centre -read
more>> |
|
 |
 

 |
Thayer Academy Summer 2007 Projects - Braintree, MA
Architect: Eck/MacNeely
Dining Hall Cosmetic Upgrades
Since Thayer Academy continues to utilize much of their space year round it is often difficult to renovate or upgrade areas of the school on a regular schedule. We maximized the small window of opportunity provided to us by removing and replacing the entire floor, replacing the wood base, and repainting the dining hall.
Middle School
The next larger renovation was performed at the Middle School. We completely demolished the Administrative Offices and rebuilt them in a new configuration. We added the security of a door access control system and viewing window to better control access to the building. In addition, we upgraded all of the finishes and millwork was added to better support the staff.
Glover Hall
This was the largest of the Summer 2007 Projects. The notable exterior changes are the replacement of all windows and associated interior work. We removed the large triangular skylight that was in disrepair and replaced it with new slate roof and drywall on the interior. Additionally we created 4 new offices when we renovated the interior lobby, Resource Center, and faculty offices. The lobby renovation consisted of infilling the floor creating an office. We installed mahogany panels, doors, and storefront which provides a more inviting environment as you enter the building. The Resource Center scope consisted of infilling the floor to create 3 new offices. We installed new aluminum storefront to enclose the offices and enlarge the existing offices. In addition to the cosmetic upgrades we installed new mechanical systems for this space as well as the lobby. |
|

 |
Bentley College Jennison Hall - Waltham, MA
Architect: Bentley College
Renovations and upgrades are continuous at Bentley. We continued the effort last summer with 13 classrooms in Jennison Hall. The upgrade include millwork chairail, coat hooks, podiums and lecture tables. This millwork supports the addition of new media teaching technology, dimming systems, and projectors. In addition to the core upgrade, there were also substantial cosmetic upgrades like paint, carpet, and window treatments.
|
|

 |
Lab Renovations @ Lake Hall, Northeastern University
This project consists of renovations to the first floor of Lake Hall at Northeastern University. The scope of work includes the selective demolition of an existing lab space and surrounding area. New millwork was installed, gypsum walls & soffits were reconfigured, tile and carpet flooring, painting, specialties, fire protection, plumbing and a new sink, extensive HVAC work (including a new RTU) and new lighting and electrical throughout. This work was completed while adjacent spaces were occupied and emergency egress in the project area had to be maintained. To ensure this extra safety and protection steps were utilized along with coordinated building shutdowns.
Architect: NU Planning & Design
|
|

 |
Adamian Classrooms – Bentley College
This is a fast track, high end summertime project for Bentley College. We were hired to demo and replace lights, ceiling tiles, carpet. millwork desks, podiums, teledata and paint. The most critical item was the millwork. The desks were one unit, horseshoe design on stepping platforms. The material was cherry and manufactured in such a way to allow for hundreds of new phone and data jacks at each work station. The Teledata on this job was very intense and contracted through us.
Architect: RE Dineen, Architects and Planners
|
|


 |
Baird Center - Home for Little Wanderers – Plymouth, MA
The Project consists of site work and new construction of a group residence. The work includes tree removal, connecting utilities to the campus system, walkout concrete basement foundation, wood frame structure and interior finishes withstanding very high abuse. Challenges of this project will include working collaborating with The Home to coordinate the schedule with a year-round open campus.
Architect: Roundell 47 |
|

 |
Robinson Hall - Northeastern University
This project consists of the interior renovation of an existing television studio that was converted into a motion analysis laboratory to be used by Northeastern Universities Physical Therapy Department. The scope of work for this project included new millwork, gypsum walls to be reconfigured, tile and carpet flooring, painting, fire protection (this includes a new 6" main into the building to replace the existing 4" main for future service to the rest of the building), plumbing and a new sink, extensive HVAC work and new lighting and electrical throughout.
Architect: Northeastern Planning and Design |
|

 |
Motel Conversion – Riverview School
In an effort to satisfy the need for immediate lodging for students, Riverview School purchased the Old Colony Motel in Sandwich. Our task was to renovate the existing motel and bring it up to Dormitory standards. We began with adding a fire suppression system including bringing in a new water main to serve it. We changed out the electrical services and upgraded all electrical in building bring it up to today's code. We added a fire alarm system, replaced windows, replaced all entry doors, siding, trim boards, roof shingles and gutters. To top it off we freshened up the paint and replaced some flooring.
Architect: CMG architects |
|
|
Administrative Offices – Riverview School
As a second phase to the wastewater treatment plant, the school needed to bring the Holtmier house up to ADA code. This summer we are replacing stairs, adding 2 ADA bathrooms and putting in a fire suppression system. There is also some miscellaneous painting, flooring and finishes that will be installed.
Architect: CMG Architects
|
|
|
Kennedy Hall and Asian American Center –
Northeastern University
This project consists of the selective demolition of the first floor at 109 & 115 Hemenway Street and the reconstruction of a new residential space in the Northeastern University Dormitory including structural work to create connectivity between the two spaces. There will be a new concrete slab installed at the sidewalk elevation at 115 Hemenway to support a Wheelchair lift that will enable accessibility for both buildings. The scope of work for this project includes selective demolition, concrete footings and flatwork, masonry renovation, structural steel, thermal and moisture protection, doors and windows (including storefront at the new entryway), gypsum drywall construction, flooring, painting, acoustical ceilings, toilet accessories, millwork, wheelchair lift, Plumbing, HVAC, Fire Protection, Electrical and Fire Alarm.
Architect: Prellwitz/Chilinski Associates Inc
|
|
|
Ell Center Bathroom Renovations
This project consists of finish upgrades to the accessible men and women's toilet rooms located in the basement of Northeastern Universities Ell Hall. The scope of work includes complete interior demolition of both bathrooms, new corian toilet partitions and counter tops throughout, new doors and windows, new floor and wall tiles, new ceilings, new sinks and toilets (including all existing brass piping to be replaced with copper), the relocation and re-piping of existing radiant heating that will be concealed by a new furred out wall with a decorative grill, the replacement of all existing wiring and new light fixtures throughout.
Architect: Northeastern Planning and Design |
|


|
Riverview Waste Water Treatment Facility and Holtmeier Addition
A new amphidrome waste treatment system is being installed within the strict tolerances of the local Cape Cod Commission. The project includes seventeen manholes serving both force mains and gravity sewer, sanitary tie-ins to each building on the entire campus and an addition to a historic building to house the H-2 treatment control rooms. Coordination is our biggest concern here since the school will remain in session during construction. The system must be up and running prior to abandonment and final building connections, while still meeting deadlines imposed by the department of environmental protection.
Architect: CMG Architects
|
|

|
Bayridge University
Renovations of the fourth floor dormitories. Work included demolishing old and installing new wiring, tele/data, sheetrock, crown molding and base, paint, lighting and flooring.
Architect: Allan Shafii |
|

|
Bayridge University - Fifth Floor
Renovations of the fifth floor dormitories. Work included the demolishing of old and installing new wiring, tele/data, sheetrock, crown molding and base, paint, lighting and new flooring. This job was very similar to the one we completed last year and exemplifies our effort to build lasting relationships with clients.
|
|
 |
Northeastern University's Burlington Campus
A fast track summer time renovation to existing classrooms on Northeastern University's Burlington campus.
Architect: Northeastern University Planning & Design
|
|
 |
Northeastern University's Ell Hall Classrooms 408-410
This classroom renovation project is at Northeastern University's Ell Hall. A new sprinkler system, HVAC unit and distribution were included in the renovations.
Architect: Northeastern University Planning & Design
|
|


|
Northeastern University Egan Hall Renovations
Renovations of lab office space with finishes and utilities specific to a lab environment. These included fume hoods, epoxy counters and extensive millwork.
Architect: Northeastern Office of Space Planning and Design |
|

|
Northeastern University Mugar Pharmacy Labs
Complete demolition and construction to create three pharmacy labs on the ground floor of the life sciences building. Challenges were met coordinating the installation of new and re-used lab equipment and waste/exhaust systems while keeping the long term building service goals of the University in mind. Work on this project included new partitions, electrical and mechanical systems. Laboratory gas, air and water piping was also installed. Throughout this project we worked closely with the Northeastern Planning and Development Department to address the specific needs of each professors.
Architect: Northeastern University Planning Department
|
|


|
Concord Family Youth Services – Justice Resource Institute – Concord
Acella Construction Corporation has been brought on board as the Construction Manager to provide Pre-Construction and Construction Services for the addition and renovations to Justice Resource Institute’s Concord Family Youth Services mini campus located on Walden Street in Concord, Massachusetts. The project consists of constructing a new 3,800 sf two-story dining and recreation room facility, plus a new two-story 1,600 sf wood frame resident quarters. Renovation of 11,170 sf of existing space to include resident quarters, office area and classrooms.
|
|

|
Pelham Academy – Justice Resource Institute – Lexington
Acella Construction Corporation has been brought on board as the Construction Manager to provide Pre-Construction and Construction Services for the additions and renovations to Justice Resources Institute’s Pelham Academy in Lexington, Massachusetts. The project consists of the construction of a new three-story wood frame addition consisting of 7,000 sf to be used for classrooms/recreation room, resident quarters and staff office space. The existing 10,000 sf facility will be reconfigured to accommodate new staff office areas, kitchen and dining facilities, library and resident quarters.
|
|

|
Riverview School Grow Academic Center
Construction of a new 8,000 sf classroom facility. Our biggest concern when beginning this job was the winter weather. Keeping the client’s budget in mind, our goal was to get the building closed in and heat running by year end. We looked at the schedule, with subs and began construction with a common goal. By embracing the teamwork approach and sharing the common goal with all parties, we achieved that goal. Scope included foundations, wood structure with truss roof system, all new mechanical and electrical trades including tele/data and new finishes.
Architect: CMG Architects
|
|

|
Northeastern University Lane Health Center
This project consisted of the renovation of the entire Lane Health Care facility, entrances and corridors located in the Forsyth Building on the Northeastern University Campus. The construction process included the complete interior demolition of the space, the installation of a new HVAC system, the installation of a new electrical system and lighting through out, new interior partitions and finishes. The project was done on a fast track basis during the summer slow down while maintaining the Health Center operations in adjacent areas. The project required extensive coordination with the University to allow for the abatement of asbestos containing materials by the University.
Architect: Northeastern University Planning Department
|
|


|
4 Terri Road - Justice Resource Institute - Framingham
Total gut and renovation of a group home facility for the disabled in Framingham. This project’s biggest challenge was the schedule. Through careful planning and management the project was completed in 5 weeks, enabling the client to move in and occupy as necessary. Scope of work included new plumbing, cabinets, partitions, and finishes.
Architect : ABAX Architecture
|
|
 |