Acella Construction managed new construction:

Acella’s work included a 31‑week, three‑phase construction schedule with full‑time supervision, with off‑hours demolition in each phase and Saturday work for corridor flooring and ACT installation. The work includes electrical systems consisting of receptacles, lighting, CAT‑6 cabling, wireless access points, rooftop power, and three card‑swipe locations, as well as vapor mitigation, moisture testing, and floor leveling. We also performed slab trenching and concrete infill for underground plumbing at the concrete ramp, HVAC DDC controls, JLC T‑bar lighting, and removal of additional ductwork and piping above the ceiling.

2024-170

North Attleboro, MA

Architect: Annino Incorporated Architects