Healthcare

T. Bear Inc.

The project consisted of a renovation to an existing building; previously the space, which occupies the entire lower level of a strip mall at 3103 Cranberry Highway, housed a martial arts studio, had few walls and was absent of plumbing and electrical. Work included installing new fire protection and fire alarm systems, new main electrical service to the building, and new electrical circuits throughout the space, as well as new HVAC and a new gas-fired generator, Acella’s Cannabis Construction Team met the challenge of creating a facility that combines numerous manufacturing elements, a laboratory, offices and an employee locker room in one aesthetically pleasing and functional structure.  Construction on the 8,000-square-foot facility includes a modular cryo-ethanol extraction lab, warehouse, manufacturing facility, and two offices for TBI’s product development team.